KEY TAKEAWAYS
✓
Verify certifications are current and scope-matched — an ISO 9001 cert doesn’t cover aerospace requirements the way AS9100 does.
Verify certifications are current and scope-matched — an ISO 9001 cert doesn’t cover aerospace requirements the way AS9100 does.
✓
Ask for actual capability data, not just equipment lists. CPK values and GR&R studies reveal whether a shop can hold tolerance consistently.
Ask for actual capability data, not just equipment lists. CPK values and GR&R studies reveal whether a shop can hold tolerance consistently.
✓
First article inspection reports and CMM data should be standard deliverables, not upsells.
First article inspection reports and CMM data should be standard deliverables, not upsells.
✓
ITAR registration is non-negotiable for defense and aerospace programs — confirm it before sharing any controlled technical data.
ITAR registration is non-negotiable for defense and aerospace programs — confirm it before sharing any controlled technical data.
✓
Lead time promises mean nothing without visibility into current capacity and queue depth.
Lead time promises mean nothing without visibility into current capacity and queue depth.
Question 1: What Certifications Do You Hold — and Are They Current?
Certifications aren’t a rubber stamp. They represent audited quality systems, and the scope matters as much as the certificate itself. Ask for the actual certificate, not just a logo on a website. Confirm the expiration date, the issuing registrar, and whether the scope covers the work you’re sending them. A shop certified to ISO 9001 has a solid quality management baseline, but if you’re sourcing aerospace hardware, you need AS9100 Rev D — which adds requirements for configuration management, first article inspection, and FOD prevention that ISO 9001 doesn’t mandate. For defense work, ITAR registration with the U.S. State Department is a legal requirement before any controlled technical data changes hands. Some shops display outdated certificates or hold certifications that don’t cover their machining operations. Always verify through the registrar’s public database. If a shop hesitates to provide current documentation, that tells you something. Nimble’s certified partner network maintains active AS9100, ISO 9001, and ITAR registrations — and documentation is available before any data is shared.
WARNING: Never transmit export-controlled CAD files or drawings to a shop before confirming their active ITAR registration. Violations carry criminal penalties — the responsibility sits with you as the exporter.
Question 2: What Equipment Do You Run — and How Old Is It?
An equipment list is a starting point, not a qualification. What you really need to understand is whether their machinery can hold the tolerances your parts require, and whether it’s maintained well enough to do it consistently. Ask about machine vintage and last calibration date. A 15-year-old VMC that hasn’t been ballbar-tested recently is a tolerance liability on tight-tolerance work. More importantly, ask about spindle speeds, axis travel, and workholding capabilities relative to your specific geometry. A shop running primarily 3-axis VMCs quoting your 5-axis impeller isn’t the right fit — they’ll fixture-flip the part multiple times and introduce cumulative error. For turned parts, understand whether they have live tooling and sub-spindles, which directly affects cycle time and concentricity on complex turned components. Sheet metal work requires a different conversation entirely — ask about press brake tonnage, laser cutter bed size, and whether they have a Trumpf, Amada, or comparable platform. Equipment capability needs to match your geometry, not just your material.
Question 3: Can You Demonstrate Process Capability — Not Just Quote It?
Any shop can claim they hold plus or minus 0.001 inch. Far fewer can prove it. Process capability is measured with data — specifically Cpk and Ppk values from production runs, not one-off setups. Ask whether they perform process capability studies on critical dimensions and whether they can share representative data from similar work. A Cpk of 1.33 or higher on a critical feature is a reasonable baseline expectation for production runs. Below 1.0 means the process is not capable — you’ll get defects. For high-volume or safety-critical parts, ask whether they conduct Gauge R&R studies to confirm their measurement systems are themselves capable. A shop measuring a 0.0005 inch tolerance with a micrometer that has 0.001 inch resolution is already lost before the part hits the table. This question also surfaces how statistically literate the shop’s quality team is. If their quality manager can’t explain what Cpk means, that’s diagnostic. You want shops that treat SPC as an operational tool, not a customer-facing checkbox.
RULE OF THUMB: Require Cpk >= 1.33 for critical dimensions on production parts. For safety-critical aerospace or medical features, Cpk >= 1.67 is the appropriate threshold.
Question 4: What Does Your First Article Inspection Process Look Like?
First Article Inspection (FAI) is your primary defense against systematic defects entering production. Ask exactly what their FAI includes and whether it’s performed to AS9102 Rev B if you’re in aerospace. A compliant AS9102 FAI isn’t just a dimensional report — it includes a design documentation review, material certifications, process certifications, and a complete balloon drawing with every characteristic measured and recorded. For non-aerospace commercial work, at minimum you should expect a full dimensional report against the drawing, not a spot check of three features. Ask whether they use a CMM (Coordinate Measuring Machine) for first articles or rely solely on hand tools. CMM data gives you an auditable, repeatable measurement record with actual XYZ deviations — hand tool reports are only as good as the operator and the instrument. Some shops charge extra for CMM inspection. That’s a yellow flag. CMM data on first articles should be standard practice, not a premium service. At Nimble, CMM inspection is included as a standard deliverable — not an add-on.
Question 5: How Do You Handle Material Traceability and Certs?
Material traceability is non-negotiable in aerospace, defense, and medical supply chains — but it matters in commercial work too. Ask how the shop receives, logs, and maintains material certifications (certs) from their stock supplier. A proper cert should show the heat or lot number, alloy designation, temper, and mechanical properties tested to the applicable material specification — AMS, ASTM, or equivalent. If they’re buying from a distributor, ask whether that distributor is on an approved supplier list (ASL) and whether they flow down counterfeit prevention requirements. Counterfeit raw material is a real problem, particularly in titanium and high-strength aluminum supply chains. Shops should also be able to demonstrate physical segregation of materials on the shop floor — clearly labeled bins, alloy-specific tooling where required (to prevent cross-contamination in exotic alloys), and a documented material traveler that follows the part through each operation. Ask to see a sample traveler. If they can’t produce one quickly, or it’s missing process step sign-offs, their traceability chain has gaps.
KEY INSIGHT: Always request a copy of the raw material cert with your finished part documentation. If a shop can’t provide heat/lot traceability to the finished part, you cannot trace a defect back to its source — and in a recall scenario, that’s a serious liability.
Question 6: What Are Your Lead Times — and What’s Driving Them?
Lead time is one of the most commonly misrepresented metrics in manufacturing. A shop might quote you four weeks, but that number is meaningless without context. Ask what the current queue looks like and what percentage of their capacity is committed. A shop running at 95 percent capacity can’t absorb a rush order without pushing someone else — and that someone might be you next time. Ask how they handle expedite requests and whether there’s a premium associated. Legitimate shops have a structured expedite process; shops that casually promise rush delivery on everything are either underbooked or overpromising. Also ask about what drives their lead time — is it raw material procurement, programming, setup, or finish operations? Understanding the critical path helps you determine whether design changes or material substitutions could compress the schedule. If they outsource surface finishing, plating, or heat treatment, factor that sub-supplier’s lead time into the total. Many delivery misses happen at those handoffs. Get a breakdown, not just a number.
Question 7: Do You Offer DFM Feedback — and When?
Design for Manufacturability (DFM) review is one of the highest-value services a capable shop can provide — and many don’t offer it proactively. Ask whether DFM feedback is part of their quoting process or whether they’ll manufacture whatever drawing you send them, defects and all. A shop that identifies a problematic deep pocket, an unnecessarily tight tolerance on a non-functional feature, or a thread callout that conflicts with standard tooling before cutting metal is worth a significant cost premium. DFM feedback at the quoting stage costs nothing and can save thousands in rework. Specifically ask whether they flag tolerance stack-ups, thin wall sections, surface finish conflicts with material behavior, and fixturing challenges that might require custom workholding. These aren’t edge cases — they show up in most complex parts. The quality of DFM feedback also tells you how technically engaged the shop is. A quote with three lines and a price is not a DFM review. You want annotated feedback from an engineer who actually looked at your geometry. Free DFM review is part of every Nimble quote — issues are flagged before anything is committed to toolpath.
KEY INSIGHT: If a shop never pushes back on a drawing, they’re either not reading it carefully or they’re planning to build it as-drawn and ship the problem back to you as a nonconformance.
Question 8: How Do You Handle Nonconformances — and What’s Your Corrective Action Process?
Every shop produces a nonconforming part at some point. What separates good suppliers from bad ones is how they respond when it happens. Ask whether they have a formal nonconformance reporting (NCR) system and what triggers it. Out-of-tolerance dimensions, wrong material, incorrect finish — all of these should generate a documented NCR before the part leaves the building, not after you find it in incoming inspection. Ask how they disposition nonconforming material — do they have a Material Review Board (MRB) process for use-as-is or repair decisions, or does one person make that call informally? For AS9100 shops, MRB authority and corrective action processes are audited requirements. Ask for an example of a corrective action report (CAR) they’ve issued. Look for root cause analysis that goes deeper than ‘operator error’ — that’s almost never the actual root cause. Shops that do this well use structured methods like 8D or Ishikawa analysis. The willingness to share this documentation, and the quality of the analysis, tells you more about a shop’s quality culture than any certification ever will.
READY TO SOURCE?
Get a quote from Nimble’s certified partner network.
Upload your drawings and get a detailed quote within 24 hours. Free DFM review included.
Table of Contents
- Question 1: What Certifications Do You Hold — and Are They Current?
- Question 2: What Equipment Do You Run — and How Old Is It?
- Question 3: Can You Demonstrate Process Capability — Not Just Quote It?
- Question 4: What Does Your First Article Inspection Process Look Like?
- Question 5: How Do You Handle Material Traceability and Certs?
- Question 6: What Are Your Lead Times — and What’s Driving Them?
- Question 7: Do You Offer DFM Feedback — and When?
- Question 8: How Do You Handle Nonconformances — and What’s Your Corrective Action Process?
Related Services
Get a Quote in 24h
Upload your drawing and get a detailed quote with free DFM review.
// NIMBLE MANUFACTURING
Precision parts, quoted in 24 hours.
AS9100 and ISO 9001 certified partner network. CNC machining, sheet metal, injection molding, and more.

